Results 1 to 4 of 4

Thread: Risk Management- ISO 15189 NC- some help please

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    1. I think risk management is the broader term, quality risk management is part of "risk management"
    4. Our approach to risk assessment for ISO 15189 is to use FMEA. The steps of the analytical process including the pre-analytical, analytical, and post analytical phases can be analysed in turn. The risk mitigated at each step. The output of an FMEA can be a Quality Control Plan if desired. The CLSI have produced guidance and there is also guidance in ISO/TS 22367

  2. #2
    Forum Member
    Join Date
    Nov 2016
    Posts
    43
    I like the FMEA approach and am considering a standalone document on QRM for BT. I see a lot of value in process mapping for BT. Perhaps start with your critical BT processes within your validation master plans?? You will already have assessed them as critical so you are almost there?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •